top of page

Mighty Sawdust Blogs

Search
Writer's pictureMighty Sawdust

The Shed

The shed is finally built. I have been busy since getting it insulated. During the week obviously time is limited with full time job. But I did manage to get the walls insulated and about 95% done drywall in those walls. Only a few oddball cuts still needed. I did start on insulating the ceiling. I hope to get that completed within the next 2 days, so I can get that drywall up. So hopefully on Saturday I can get mudding the drywall. Goal if everything goes to plan I can spray the interior walls and ceiling early Sunday. I would love to be able to start getting all my tools from the garage and organized in the shed starting Sunday evening. Hopefully I will have a video ready on my YouTube channel of this part of the chapter. Next week goal is to start filming "The Build" which will feature a detail build of my "Ultimate workbench". So watch for that. Definitely will want to get a batch of cutting boards going soon after getting that workbench up.

So stay tuned for information here, I will try to get a fall themed cutting design to start out.


4 views0 comments

Recent Posts

See All

Comments


bottom of page